The Engineering Boss

Chapter 672 Equipment Situation

"Boss, there are currently 27 people on this construction site plus the administrators, including five administrators, one chef, and the rest are workers." The middle-level administrator said, "Of the twenty-one workers, ten Two are our own mid-level workers, and the rest are workers hired from outside."

Chen Yang nodded when he heard the words. A section of retaining wall had already been built on site. This section of retaining wall was estimated to be thirty to forty meters long. As for how high the retaining wall would be, Chen Yang didn't know very well.

"How high is the retaining wall you built?" Chen Yang asked casually.

The main reason is that he wants to know which of the three sewage treatment plants has the tallest retaining wall.

"Boss, the average height of our section of the retaining wall is 3.4 meters, and the total length is 40 meters." The middle-level administrator replied, "The retaining wall has been completed, and the soil has just been filled. It will be completed when the road roller is pulled in at night. crush."

No wonder Chen Yang saw that this small area was full of empty soil, which was supposed to be crushed.

Moreover, the retaining walls of the three sewage treatment plants are currently the tallest for Liu Yuehai, followed by the tallest retaining wall at his place, and the shortest retaining wall belongs to Liu Peng and his team.

"Can the steamroller be pulled in tonight?" Chen Yang asked.

"The trailer cannot pass through the urban area during the day, so it is impossible to pull the roller in. At present, the trailer has pulled the roller to the suburban location, and it can be pulled into the scene at twelve o'clock in the evening." The middle-level administrator explained, "Boss, tomorrow After this area is crushed, our working surface will come out, and then we can increase the number of workers and speed up the progress.”

Add workers?

I'm afraid there will be no more workers here now, so it can only be constructed in this way temporarily. After a project in Changxi City is completed, he will have extra workers transferred over.

Of course, the completed project must be his own project, otherwise he would not have his workers to complete other projects.

"By the way, is the material officer in the project department? How is he purchasing the equipment for the sewage treatment plant?" Chen Yang suddenly thought of this question.

The equipment of the sewage treatment plant is very important. After the preliminary work is completed, the equipment must be installed, which is a very important part.

"I don't know if the materialist is in the project department, so I'll call and ask him where he is." After saying that, the middle-level administrator took out his mobile phone and made a call.

Chen Yang went to the position of the retaining wall and took a look. The worker's pointing was done very well, very regularly, and looked very comfortable.

At this time, the middle-level administrator came to Chen Yang and said: "Boss, the material staff will come over immediately, if you want to ask the boss what you want, just ask him face to face.

"

"Okay, I'll ask him when he comes." Chen Yang said slowly, "The seams of these retaining walls were made by our workers, right?"

"Yes, it was done by our workers. The supervisor and the owner saw it yesterday afternoon and praised us for the good stitching."

The outside of this section of the retaining wall will not be buried, so the hooked seams will not be buried, and everyone can see it at a glance.

Therefore, the appearance is definitely a pass. After all, the owner and the supervisor praised it after reading it, and it should be able to pass the acceptance inspection in the future.

"Appearance is like a person's face. We must do it well, which is equivalent to doing our face well." Chen Yang said, "In the future, it is best to let our workers do it for projects like this appearance. Yet?"

"I know the boss, I will arrange our workers to do this work in the future."

Two minutes later, the middle-level materials staff came in front of Chen Yang.

"How did you purchase the equipment for the four sewage treatment plants?" Chen Yang asked.

"Boss, I have booked the equipment for the four sewage treatment plants. I will bring in a batch of equipment in half a month, and then I will pull in a batch of equipment in a month, and I will pull in all the remaining equipment in the last month. "The mid-level material officer replied, "As for the quality of the equipment, there is no problem at all, I purchased it according to the model on the bidding document."

"The time for the equipment to enter the site is not a big problem. Remember to check the certificates when the equipment enters the site. These things are very important." Chen Yang said, "After the equipment enters the site, should we install it ourselves or they will sell the equipment? The factory sent staff to install it?"

This is a very important issue. Chen Yang still hopes that the equipment factory will send staff to install it, so that he can feel at ease.

My own people are not familiar with these devices, and there are some problems after installation, so Chen Yang is a little worried.

Therefore, it is best to hope that the people from the equipment factory will send staff to install it.

"Boss, when the time comes to install the equipment, their engineers and technicians will come to help us install it, but they said that we need to pay the wages for the engineers and technicians who come to install the equipment." The middle-level material worker said.

"There is no problem with this. As long as they arrange for someone to come, we will arrange for him here. After you come down, you should communicate with the people in the equipment factory. When we need technicians, we will arrange them as soon as possible. Don't arrange them in ten days and half a month." Come here, that won't work." Chen Yang urged.

Many manufacturers that supply equipment will not give you a loose belt when supplying equipment, but it is difficult to arrange for technicians to come over. You have waited here for a few days, and they still haven't sent someone over.

This is the problem that Chen Yang is most worried about. He was already a little tight on the progress, so it is not worthwhile to be delayed by such a situation.

"Okay boss, I will communicate with the other party when I get down." The middle-level administrator said, "Boss, is there anything else you want to ask?"

"I don't have anything to ask you. You have to arrange the material here so that you don't stop work on the construction site because of the material, you know?" Chen Yang said, "If you are too busy, you have to bring it up, and I will Arrange someone to assist you as soon as possible."

"Well, good boss. At present, I still have no problem alone, and I can handle it completely." The intermediate material worker said.

After a while, several people returned to the office of the project department. Chen Yang walked around the office and sat on a chair.

"The notice boards on the wall are posted, and they have fallen off in just a few days." Chen Yang pointed to the notice boards on the wall and said, "I transferred more than 30 workers from Changxi City a few days ago. Come up, how are they doing?"

"Boss, I arranged them in another sewage treatment plant. They have settled down now, but they haven't started working yet. It is expected that they will be able to work the day after tomorrow, because the excavator is under construction these days, and there is basically no work for them. .”

"When the excavator gets a part of the working face out, they can officially go to work."