The Engineering Boss

Chapter 446: Piling

"Engineering Boss New()" Find the latest chapter!

After a while, Ma Tao returned to Chen Yang's office after making the phone call.

"Brother, I just called the second uncle to ask about it. The second uncle spoke a little hesitantly. I feel that this is indeed what Mr. Chen said. The second uncle did this."

Hearing this, Ma Gang looked at Chen Yang with some embarrassment and said, "Mr. Chen, I have caused you trouble. I will deal with this matter immediately. The situation you just mentioned will never happen."

"This is the best." Chen Yang said, "There is one more thing I want to remind you, and that is the issue of safety."

"Presumably all of you have heard that there was a safety accident on our construction site, so the higher-ups have been very strict with us recently. When you go down, you must take this matter seriously. You must talk to the workers and do what you need to do. .”

"Once there is a problem with the inspection from above, if a fine is issued, then our project department will not pay the fine. Then I will directly deduct your money and double the deduction. Do you understand what I mean?" Chen said. Yang looked at the two with a smile on his face.

The two looked at Chen Yang with an apologetic smile. In the eyes of the two, what Chen Yang said should not be a joke with them, so they decided to take it seriously after coming down.

After Ma Gang and Ma Tao left the office, Chen Yang drove to the Bright Pearl to take a look. This investment project was what Chen Yang cared most about, and it was also the project closest to Chen Yang's office.

Half an hour later, Chen Yang arrived at the site of Bright Pearl. Chen Yang's car stopped at the gate, and when he got out of the car, he could see the dust floating around the entire construction site, especially the scene where there was a car passing by.

Didn't someone arrange watering?

The dust flying all over the sky, if it is seen by the Environmental Protection Bureau, it will definitely be fined.

Chen Yang immediately called the middle-level administrator at the scene, and soon the middle-level administrator came in front of Chen Yang.

"Look at the dust flying all over the construction site. Did you arrange for workers or sprinklers to sprinkle water?" Chen Yang asked.

"Boss, I always arrange for people to sprinkle water, but today there is a little situation. The main reason is that the construction water on our construction site needs to be reconnected, so it may delay a day." The middle-level administrator hurriedly told Chen Yang about the situation.

It turned out to be such a situation!

"How long will it take for the sales department to be repaired?" Chen Yang asked looking at the two-story building that was under construction not far away.

Once the sales department is repaired, Chen Yang will consider starting to pre-sell his own house. At present, Chen Yang has not started advertising the Bright Pearl, mainly because now 50% of the people in Changxi City know about the Bright Pearl. exist.

Of course, most of them said that the geographical location of Bright Pearl is not good, so how could they choose to build a shopping mall so far from the city center.

Therefore, many people look at Bright Pearl with a wait-and-see attitude to see how many people will buy houses in Bright Pearl.

Chen Yang also understands their gestures. After all, only a few people know the design graphics of Bright Pearl, so everyone thinks that the house built by Bright Pearl is similar to other buildings.

When Chen Yang fully announces the design model of Bright Pearl, perhaps many people will change their views, and those who have money will definitely buy the house of Bright Pearl.

In fact, these are all Chen Yang's own thoughts. Whether the real situation can develop as he expected depends on the follow-up situation.

"Now we have to wait for the material staff to buy the materials and carry out the decoration. The fastest time will be half a month." The middle-level administrator replied.

"Can you officially pre-sell the house on New Year's Day?"

The middle-level administrator thought for a while and said, "There should be no problem."

Since the mid-level administrators said that there was no problem, Chen Yang felt relieved a lot. Next, Chen Yang will arrange personnel to start making the model of the Putao high-rise building, and then place it in the lobby of the sales department.

Not only is there a model of the grape building in the sales hall, Chen Yang also wants to carve a huge model of the grape building outside the gate to show the uniqueness of the grape building.

"How many piles have been driven so far?"

Chen Yang walked to the foundation of Putao's high-rise building, stood on a high place and looked down. At the moment, two pile drivers are working hard to drive piles.

The middle-level administrator said: "The two machines can drive up to six piles a day. So far, forty piles have been driven out, and thirty-two piles have been poured."

Chen Yang has seen the blueprints of Putao high-rise buildings. The piles designed on the blueprints are close to 200, and the depth of the piles is at least 25 meters. According to the progress mentioned by the middle-level administrator, I am afraid that the piling costs It will take about a month or so to finish.

After a rough calculation, it is impossible to complete the foundation of this tall grape building without two or three months.

After the foundation is completed, the progress of the main part cannot be raised. After all, the size of each "grape" room on each floor of the Putao high-rise building is different, and it is necessary to slowly match the formwork to support the formwork.

Unlike the current buildings, after the foundation is repaired, the size of each floor on the main body is the same. As long as three or four sets of templates for one type of apartment are equipped, they can be used all the way to the roof. There is no problem at all when you come out of the floor.

But Chen Yang's grape high-rise is different. The size of each floor and each unit type is different, so each unit type needs to be re-made with formwork, which takes a lot of time and wastes a lot of materials.

This is why Chen Yang didn't dare to let other people do it. He was afraid that it would be difficult to deal with problems if they did it, so he only dared to ask his own workers to do it.

According to this progress, Chen Yang expects to be able to complete three floors in a month, which is not bad, he dare not expect too much.

Of course, if he has enough workers, then this progress may be improved a bit. The key is that Chen Yang doesn't have many workers in his hands.

"The construction space on the site is not that big anymore, otherwise we would call in a pile driver." Chen Yang said, "How many workers are there on our construction site?"

"Boss, we have 16 mid-level workers, 28 junior workers, and 12 management staff. There are 56 people in total." The middle-level administrator said.

There are quite a lot of people here!

As for the people hired outside, Chen Yang didn't care about it. Their job was nothing more than to cooperate with their workers, that is, to help their workers.

"After the basic part is completed, how many of our own workers do you need for the first floor of the main structure?"

For the convenience of reading next time, you can click "Favorite" below to record this (Chapter 446 Piling) reading record, and you can see it next time you open the bookshelf!

If you like "Engineering Boss", please recommend this book to your friends (QQ, blog, WeChat, etc.), thank you for your support! ! ()

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like