The Engineering Boss

Chapter 270 Patrolling the scene

Xu Mengyu's grandmother's house was in another town in the countryside. Under the guidance of old man Xu, Chen Yang drove for about half an hour and finally arrived at the destination.

To be able to live to the 90th birthday in a radius of tens of miles is already a long-lived existence, so there are many people attending this birthday banquet, and this time Xu Mengyu's grandmother's house is also planning to hold a big celebration.

The old man Xu and his wife came here to help two days ago. The reason why they went back was because of Xu Mengyu and sisters, and more importantly, because Chen Yang was coming, so they ran home at noon yesterday.

During the whole birthday banquet, Chen Yang followed old man Xu. This is what old man Xu told Chen Yang on the way here, because Xu Mengyu and Xu Mengling wanted to chat with their grandmother, so Chen Yang could only Follow old man Xu.

And this old man Xu was not "restless" at all, he introduced all these relatives to Chen Yang, and introduced Chen Yang by the way, for fear that others would not know that Chen Yang was his daughter's boyfriend.

Chen Yang felt that following old man Xu was very tiring, even more tiring than him holding a hoe to dig in the ground. He wished that this time would pass quickly.

As soon as the lunch was finished, Chen Yang immediately asked old man Xu to leave. In fact, Chen Yang was not the only one who wanted to leave, even Xu Mengyu and Xu Mengling wanted to slip away.

The three of them were very happy when they got the permission to leave, and they drove back to the county town. After sending Xu Mengling back to school, Chen Yang and Xu Mengyu hurried back to the city.

It was only five o'clock in the afternoon when I returned to the city. Zhou Hongli had gone somewhere in the office, and only the middle-level budget officer was busy in the office alone.

"Sister Zhou is resting in the rented room, and I will also go back to rest and come to work tomorrow."

Xu Mengyu left, and Chen Yang sat on the sofa in his office, holding a bid document made by a mid-level budget officer and carefully looked at it. When he had just finished reading the content of the business part of the bid document, the transparent panel suddenly popped up up:

"Your card with the end number xxxx has a bank income of 347,000.00 yuan and a balance of 421,821.29 yuan at 17:37xx on April 20th"

Finally, I have some income, but this income is still too little!

Chen Yang's current focus is on the road rectification project in Lida County. After all, it is a project of more than 23 million yuan, and if the progress is 10%, there will be a reward of more than 2 million yuan.

I don't know if the construction can officially start on the 25th?

Three days passed in the blink of an eye, and Chen Yang drove to Lida County early in the morning on April 24.

Chen Yang went to bring two middle-level workers and two junior workers there this time. Five or six workers have been found on the site to direct the traffic situation. people command.

At 10:30 in the morning, Chen Yang had arrived at the starting point of road rectification. At this time, the double lane on the left of the road entrance had been surrounded by warning tapes, and a notice board had been erected on the left and right sides of the intersection.

The junior construction worker was commanding a large excavator to crush the concrete pavement. It took more than three hours to break the seven or eight-meter-long cement pavement according to the seven o'clock work.

"The strength of the concrete poured before is a bit high, and it seems difficult for this excavator to break." Chen Yang came to the junior construction worker and said, "The concrete poured on this road before should be C30 concrete."

"It should be poured C30 concrete, otherwise the road could not be so badly crushed. The starting point may be a special case, and the strength of the concrete is a bit high." The junior construction worker explained, "The more than 20 meters above the starting point After the shattering is completed, the latter will be shattered, and the speed should be able to increase a lot."

It is true that there are basically no big cracks in the 20-odd meters of the initial section.

It can even be reused without crushing, but it is a pity that it is clearly stipulated that it must be completely broken and poured again.

"Have all the excavators entered the site today?" Chen Yang asked.

When I called yesterday to inquire about the situation at the site, I learned that only one excavator was delivered to the site at present, and the excavator that arrived at the site seemed to be this excavator. I don't know if it's shipped or not.

The junior construction worker said: "Two large excavators have been transported in this morning, and the other one should arrive at noon. At present, the four-axle truck has not notified them to come, anyway, they were notified very quickly, less than half an hour We can all get to the scene.”

"I brought four workers here today. Do you need help from workers here?" Chen Yang asked, "Safety is the most important thing. When it is broken, pay attention to passing vehicles, especially pedestrians. I am worried that small broken stones will be hit by bullets." The Bank of China caused unnecessary trouble."

"I will pay attention to the boss. Then leave a worker for me and let him assist."

"Okay. By the way, my car is parked here. You can take a look for me. My car dare not drive in!"

After Chen Yang finished speaking, he walked in with the remaining three workers. After a while, Chen Yang saw a pickup truck coming to pick them up.

This is what Chen Yang called the junior administrator when he was parking. If he walked in such a long distance, he didn't know how long it would take, so he told them to use a pickup truck to pull him and others.

After getting into the co-pilot, Chen Yang asked the junior administrator: "Are the two excavators that arrived at the scene this morning moving?"

"There is one excavator that hasn't been moved yet. He said that it will start in the afternoon." The junior administrator said, "The other one is leveling the site where we stack materials and the site of the mixing station. It will take about a day or two here."

"The small mixer can be transported to the site for installation the day after tomorrow, so hurry up and level the site. If one excavator is not enough, use two excavators. Anyway, the small mixer must be installed immediately when it is transported to the site. The installers can't wait that long for us."

Soon the junior administrator took Chen Yang to a large flat field by the side of the road. At this moment, a large excavator was leveling, and Ding Zhanshun and the junior material staff were directing the site.

"Is this space enough?"

Obviously, this vacant land has been abandoned for a long time and has not been planted with crops. If it is planted with crops, the owner's family will definitely not agree to stack materials on it.

Excluding the space occupied by the installation of small mixers in this open space, the remaining space can store up to five or six hundred square meters of materials. It stands to reason that there should be no problem with the continuous supply of materials on the day of concrete pouring. The key is that if the materials cannot be pulled out The materials piled up on this site will definitely not last long.

"How is the problem of sand and gravel material implemented?"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like