The Engineering Boss

Chapter 266 Stirring Equipment

Chen Yang simply calculated in his mind that the amount of concrete needed for this road rectification is more than 40,000 cubic meters. If the commercial concrete station in Lida County is used to supply concrete, the concrete will be 350 square meters per square meter. In more than fifteen million.

If Chen Yang buys the mixing plant equipment and builds a small mixing plant, and buys and leases the materials, tankers, etc., then all of this will only cost about 267 per square meter of concrete, which is equivalent to saving 80 per square meter of concrete. One yuan, more than 40,000 square meters of concrete can save more than three million yuan, which is a very large sum of money.

Therefore, after much deliberation, Chen Yang decided that it would be cost-effective to build a small mixing plant by himself, but to implement the mechanical equipment of the concrete mixing plant, Chen Yang could only go to Liu Kai, because Liu Kai was very familiar with this part.

It's a pity that Liu Kai was not in Changxi City, but stayed in Ninghui County, so Chen Yang had to rush back to Ninghui County overnight.

At ten o'clock the next morning, Chen Yang asked Liu Kai to drink tea in a teahouse in the central square, and asked him about the mixing station.

In the private room of the teahouse, Chen Yang waited quietly.

"I asked you about what you told me on the phone. A set of small mixing plant equipment costs more than 100,000 yuan, and the manufacturer provides installation and commissioning. A set of medium-sized mixing plant equipment costs about 300,000 to 500,000 yuan. The manufacturer also provides installation and commissioning." Liu Kai said slowly, "I think a small batching plant equipment is enough for your project, and there is no need to buy such a large equipment."

What Chen Yang wanted to buy in his heart was the equipment of a small mixing plant. Concrete was not poured every day when the project started, basically every other day, as long as the concrete could be supplied.

"I also contacted you with a set of second-hand small mixing plant equipment. The other party said that you can take it away for 50,000 yuan, but the other party does not provide installation services. You have to do the installation and commissioning yourself. I also saw this set of small mixing plant equipment. However, it’s about new on the eighth floor. I wanted to buy it and use it before, but after thinking about it, I found it a bit uneconomical. After all, second-hand things are more or less faulty, and it’s too troublesome to ask someone to repair them. It’s better to just buy a new set equipment." Liu Kai said.

Chen Yang knew what Liu Kai meant. Second-hand equipment was cheap, but he didn't know how good it was.

The equipment often breaks down, which will only delay the construction period, which is a very unfavorable thing, so Chen Yang decided to buy a new set of small mixing plant equipment.

"Brother Liu, are you familiar with the store?" Chen Yang asked.

"I'm familiar with it. I bought the equipment for the two commercial mixing stations at his house, and I have dealt with him many times." Liu Kai smiled, "If you need it, I can contact you right away."

"I definitely need it. It just depends on the speed of the other party's supply. I'm a little anxious." Chen Yang briefly explained the situation to Liu Kai.

Liu Kai heard the words and immediately took out the phone to communicate with the manufacturer. After a few minutes, Liu Kai hung up the phone.

"The manufacturer said that the small mixing plant equipment is ready-made, and it will take 20 days at the fastest from delivery to the completion of equipment installation and commissioning." Liu Kai conveyed the manufacturer's intentions to Chen Yang.

Twenty days at the fastest!

Chen Yang's preliminary work plan was completed in one week. During this time, he had to find the location for the mixing plant, the location for the stockyard, and the leveling of the site, etc., so the time was a bit short.

Of course, it is obviously too busy to let the junior administrator and the junior construction worker do these things. Chen Yang must arrange some people to assist them.

Now that a set of small mixing plant equipment was ordered, the manufacturer needed Chen Yang to pay an advance payment before delivering the goods. In order not to lose time, Chen Yang transferred the money to the manufacturer's account in the afternoon.

On April 18, at ten o'clock in the morning at the Chauncey City Office.

Chen Yang leaned on the sofa in his office and closed his eyes to rest. When he opened his eyes, the transparent panel popped out:

[Engineering task 4: Retaining wall and culvert project of the second bid section of Yingpan Town - 50% completion progress]

[Reward amount: 290,000.00 yuan -- is being distributed]

[Additional rewards: one material worker and two junior workers--is being distributed]

[Reputation value: +2]

[Investment task 1: House construction of Chen Fugui's house in Chenjiawan -- investment progress 60%]

[Random Reward: A pickup truck dedicated to the reward project-is being distributed]

"Your end number xxxx card April 18th 10:17xx bank income 290000.00 yuan, balance 351821.29 yuan [XX bank]"

It is really too difficult for my own account to break through one million!

The reputation value has been added a bit. It seems that the system of donating one million to No. 1 Middle School is also considered an investment, rewarding a little reputation value.

Chen Yang walked out of his office and found that Ding Zhanshun hadn't come back yet, and his people were waiting for him at the moment. After Ding Zhanshun came back, they had to go to the Lida County construction site immediately.

This time, Chen Yang took the junior materials officer, junior accountant, and junior security officer, plus Ding Zhanshun, to the construction site in Lida County. From now on, these four people will be stationed at the construction site until the end of the construction site.

"In the past, you mainly looked at the area where the nearest sand and gravel materials are, how far it is from our construction site, what is the specific unit price, and how much is the shipping cost, so you can figure it out." Chen Yang said to the junior material worker , "The amount of concrete on our construction site is about 40,000 square meters, and a small sand and gravel factory cannot supply us with such a large amount of materials."

"I don't have anything to say about finances. I'll transfer 200,000 yuan to you later. Although this amount is a little less, I will use it first. If I have no money, I will call the boss." Chen Yang took a look. The junior accountant immediately looked at the junior security officer, "Your task is relatively heavy. This road is full of heavy trucks to transport minerals. Once we start construction, you have to arrange people to direct traffic safety. Once we fail to manage the safety in place If there is a little safety accident, our construction site will be in vain.”

"Remember, quality and progress are important, but your safety is more important."

Chen Yang took this time to talk to the three about their work, hoping that the three of them could quickly enter their jobs. Of course, Chen Yang, his employee, was very relieved.

Not long after, Ding Zhanshun arrived with his suitcase, and it took him almost two hours to pack it.

Just as Chen Yang was leaving for Lida County with the four of them, Xu Mengyu and Zhou Hongli came back from work.

"Chen Yang, where are you going?" Xu Mengyu asked hastily.

"Go to the construction site in Lida County. What's the matter?" Chen Yang asked suspiciously.

"My grandma's 90th birthday the day after tomorrow, my parents asked me to go back and bring you back along the way!"