"Engineering Big Brother Novel Cool Notes ()" Find the latest chapter!

The junior administrators and junior construction workers couldn't see through these drawings, so Chen Yang didn't force them to read them.

At present, the only thing to do is to wait for the system to upgrade the junior administrator and junior construction worker to the intermediate level, and then show the blueprint to the two of them.

"How's the receiving party doing today?" Chen Yang casually asked the two about the situation on the construction site.

The junior administrator said: "Yesterday, most of the water intake point, the No. 1 main pipeline, and the No. 1 branch pipeline were collected. This morning, continue with the No. 1 branch pipeline and the No. 2 branch pipeline. Go down to the No. 3 branch pipeline and collect it." The end. The No. 1 main pipeline was originally designed to be 6,430 meters. We started from half of the position, and the measured length was 3,213 meters. After changing the line, it was two times shorter than the design More than 100 meters; the No. 1 branch pipeline is 1,350 meters, and the measured length is 1,472 meters, which is more than 100 meters longer than the design after the rerouting; the No. 2 branch pipeline is 870 meters , The measured length is 846 meters, which is more than 20 meters shorter than the design after the line change. The third branch pipeline will not know the specific situation until the afternoon. "

After the junior administrator finished speaking, the junior construction worker added: "The water intake points are calculated according to the design drawings, and the increments are recorded, so the site is just a look."

The two people's reports gave Chen Yang a general idea of ​​the progress on the construction site, and the next step was to close the more than 1,100-meter pipeline of the No. 3 branch line.

"You have to make a good record of the receiving party. In the afternoon or tomorrow, I will match the measurement with the people in the project department. If there is no problem, the project is considered completed."

"By the way, I invited Mr. Yang, his project department and the supervisor to dinner in the evening. You should be able to collect the No. 3 branch pipeline in advance in the afternoon, and come back as soon as you are done."

At this time, the junior construction worker added: "At present, there is still a little work on the construction site that has not been completed. I may still be on site to direct after the collection, and I may not be able to come until later."

"Okay, then hurry over here after you're done!" Chen Yang said, "By the way, I'm fine in the afternoon, so go up and tell the workers hired on the construction site during the Chinese New Year, and ask them to come down to the office in the afternoon to pay the wages during this time." It's over."

"Wait a minute and you report the workers' working days to the accountant. I'll ask the accountant to sort it out."

In the afternoon, the administrators continued to go up the mountain and together with the people from the project department, collected the No. 3 branch pipeline, and around 4:00 in the afternoon, the local workers came to the office one after another to pay their wages.

Time passed slowly, and the wages of the workers were not completed until six o'clock in this busy work. After checking with the workers handed over to him by the junior administrator, we found that there were still seven workers who had not come yet.

Chen Yang didn't wait for the seven workers to come anymore, he had to go to the farmhouse to order two tables of meals immediately, otherwise the time would be too late, so he immediately took the junior accountant there.

When he came to the farmhouse, Chen Yang ordered two tables of meals. When he saw that there were roasted whole lambs in the farmhouse, Chen Yang simply ordered two roasted whole lambs. The purpose was to make everyone happy tonight.

After 7 o'clock in the evening, people from Mr. Yang's project department came, along with two supervisors, and not long after, several administrators from his office also came to the farmhouse.

Everyone ate, drank and had a good time that night.

March 14, a sunny day.

After waking up, Chen Yang felt a little pain in his head. Chen Yang suspected that there might be something wrong with the wine he drank last night. He squinted for a while, packed up and checked out, and went to the office. When he came to the office, he saw the accountant was paying the salary for a local worker. Zero Bookstore

"Boss, there is still the last worker. I have already called and he said that he will not come until noon."

"Well, you just wait here for him to come! By the way, there is still some money that has not been paid at the excavator, so you also call him to come, and we can leave after we settle everything." After finishing speaking, Chen Yang called out to the junior The administrator and junior construction workers went to the project department to check.

General Manager Yang's Office of the Project Department.

"This is the quantity of work collected in the past two days, can you take a look at it?" Mr. Yang handed two pages of paper to Chen Yang.

Chen Yang took the two pages from Mr. Yang and handed them to the junior administrator, and the junior administrator distributed a piece of paper to the junior construction workers. The two of them knew the measurements on the construction site best, so they could look at them better than they could. There are many spectrums.

"Boss, the length of the pipeline is correct, that is, the excavation volume calculated by them is wrong." The junior construction worker soon found out the problem, "The DN400 pipeline should be calculated according to the requirements of the A-type diagram of the typical section diagram of pipeline burial. , but the calculation of the project department is not the same as mine, I suspect that they buried the typical section B type of pipeline according to the reference pipeline."

"Also, how many sections of the No. 1 main pipeline should be calculated by referring to the type C section diagram of the typical pipeline burial. It is about 700 meters long. The section C section diagram is 30 thick C25 concrete outsourcing. This is completely underestimated for us. About three hundred meters."

When Chen Yang heard this, he looked at Mr. Yang, hoping that Mr. Yang could give him an explanation.

Mr. Yang immediately went to the junior construction worker to take a look, and soon he took out the phone and started calling, and hung up the phone after some inquiries.

"This kid said that he couldn't see clearly what others were calculating when he was calculating last night, so he calculated everything according to the cross-sectional B-type diagram. I will help you right away." Mr. Yang returned to his desk after finishing speaking.

"Come on, show me your record book for comparison!"

Mr. Yang asked the junior administrator while recalculating the amount: "There shouldn't be any problem with the amount on your piece of paper, right?"

"Mr. Yang, I also found a small problem here. The number of the townships is correct, that is, the steel bars used for the townships are a little less for us. Although the quantity is not large, the transportation is very laborious. I am afraid that Mr. Yang still needs to provide I'll add it." The junior administrator said.

When Mr. Yang heard this, he flipped through the drawings on the table and said, "I calculated the steel bars used in this pier myself, so how could I underestimate it?"

The junior administrator came to Mr. Yang and looked at the blueprint in his hand, and soon the junior administrator reacted: "Mr. Yang, you took the wrong drawing. The drawing of the steel bar used to be used for the pier was changed after the design. About 0.05T of steel bars have been added to the town pier. By the way, Mr. Yang really wanted to ask for leave and left for two days at that time, which is exactly what he should have done when you were away."

"Why didn't they tell me about it when I came back?" Mr. Yang muttered to himself, "Okay, you should figure it out, and bring me a pair too."

The junior administrator immediately gave Mr. Yang the workbook in his hand, and at the same time looked at Mr. Yang from the sidelines.

"Hey, Mr. Yang, what's going on with you, why are you making mistakes everywhere." Chen Yang smiled from the side.

"These guys are really unreliable. It seems that being lazy is still not feasible. Wait a minute, and we will fix it right away!"

For the convenience of reading next time, you can click "Favorite" below to record the reading record of this (Chapter 224 Concerning Project Quantity), and you can see it next time you open the bookshelf!

If you like "Engineering Boss", please recommend this book to your friends (QQ, blog, WeChat, etc.), thank you for your support! ! ()

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like