The Engineering Boss

Chapter 146 The Increased Work Volume of the Reservoir

Although Chen Yang didn't go to the site often to see what happened on the reservoir, he still called the construction workers on the site every day to inquire about the situation on the construction site.

Recently, nothing special has happened on the reservoir. Everything is being constructed according to the construction drawings, and the progress can be said to be very fast.

However, on the way to the city yesterday, the construction workers at the Taiping Reservoir site told Chen Yang that two sections of retaining walls will be added about 50 meters downstream of the reservoir, that is, under the dam of the reservoir. The volume is about 500 square meters.

Chen Yang had seen the topography of the site, and according to the design on the drawing, two concrete retaining walls were designed at the foot of the dam below the spillway. However, these two sections of concrete retaining walls are only ten meters long, and after ten meters there is the natural flood. ditch.

"I looked at the terrain of the site the day before yesterday. The soil on both sides of the gully at the downstream of the spillway exit is very loose. Once a flood occurs, the soil on both sides will definitely be washed down into the ditch. When the time comes, it will get bigger and bigger. The bigger the rush, the washing away of the soil on both sides will definitely affect the foundation of the dam, which is definitely not acceptable, so I suggest adding two sections of retaining walls on both sides." Supervisor Liu told Chen Yang the situation at the scene for a moment.

"Boy Deng, the person in charge of the site of the management bureau, went back and reported my opinion to the director. I also told the director this morning. Everyone went to see the scene together this afternoon. After reading it, the director of the management team also agreed with my proposal. The proposed plan needs to add a section of retaining wall. At present, the management bureau is inviting design and geology personnel to take a look at the situation, and the plan will be finalized in the next few days if nothing unexpected happens."

Chen Yang looked at the list on the reservoir. The unit price of the concrete retaining wall is more than 460 yuan, and the unit price of the masonry stone retaining wall is also a little more than 400 yuan. The difference between the two is only a few dozen yuan.

However, this unit price is considered very high in the current market. At least one square meter of concrete can make a profit of about 100 yuan, and a 500 square meter retaining wall is about 50,000 yuan.

"The part with the highest unit price on the list is the part of the retaining wall. Now that this part of the retaining wall has been added, is it concrete or masonry?" Chen Yang asked.

Supervisor Liu said: "My proposal is to build a masonry retaining wall. There are a lot of stones on your construction site. If you use those stones, you don't need to go outside to buy stones."

"If you make a concrete retaining wall, you have to prepare some more materials, which is a bit out of the question."

Chen Yang picked up the wine glass: "Thank you, Supervisor Liu!"

Inspector Liu had promised Chen Yang that he would increase Chen Yang's amount before, so that Chen Yang would not lose money as much as possible, and now Inspector Liu has recovered almost 50,000 yuan in profit for Chen Yang.

As soon as the two glasses touched, a transparent bread suddenly appeared in front of Chen Yang:

[Main task: Contract a project of more than 3 million yuan and organize personnel to construct it--reservoir renovation project]

[Reward for project completion: 3.47 million]

[Hidden task: Add 500 square walls]

[Engineering task time: ten days (February 5)]

[Hidden task completion reward: a pickup truck dedicated to engineering]

The hidden mission appeared again, and the reward was still an engineering pickup truck!

Chen Yang was very happy. After being busy for so long, he didn't see a single mission appear or complete, and now a hidden mission finally appeared.

"Boss Chen,

I am curious to ask, where did you find those people on your construction site? They are very responsible and very efficient. This is the first time I have met such workers. " Supervisor Liu asked after taking a bite of the dish.

Supervisor Liu basically stayed on the construction site recently. Apart from the local workers, the workers he observed the most were the workers under Chen Yang. They were the most professional workers he had ever seen.

Chen Yang knows that everyone who has seen his workers will admire his workers, after all such workers are hard to find in reality.

"My workers were invited from Jiangxin. You should know the people there. I was lucky enough to travel there and visited their village during my college days. I found that they worked very hard. In their village I met a lot of people after staying for two days. This year I contracted the project to do it, so I called them to help me." Chen Yang made up a lie.

But some of these lies are indeed true. Chen Yang didn't say anything nonsense, that is, some of the workers did come from a certain village in Xinjiang, but Chen Yang never went there.

Jiangxin has a vast land and few people. The villages are separated by hundreds of kilometers or even hundreds of kilometers. Chen Yang checked the address of the worker's ID card, but unfortunately the address was not shown on the map.

"It turns out that's the case. They came quite far away, about two or three thousand miles away." Supervisor Liu said.

Chen Yang smiled, and raised his glass to respect Supervisor Liu.

The workers rewarded by the system have a clear source, so Chen Yang decided to take a look at this place if he had time!

The meal between Chen Yang and Supervisor Liu ended within a short time. As for the wine, they only drank three bottles each.

After returning to the hotel, Chen Yang washed up and lay on the bed watching TV. When he was about to fall asleep, the ringing of his mobile phone woke him up.

"Brother, have you rested?" came the voice of sister Chen Qin on the other end of the phone.

"Already rested."

"Brother, did you buy the materials I told you to buy?"

"I bought it and kept it in the car." Chen Yang said, "Why, do you need those materials?"

Chen Qin: "Well, I need those materials. Brother, when will you bring them back to me?"

Hearing this, Chen Yang thought for a while and said, "I don't seem to have anything to do tomorrow, so... I'll bring it back for you tomorrow."

"Are you going to come back tomorrow?" Chen Qin murmured on the other end of the phone, "Mom said that she would buy some things from the county and bring them back from the county if she said she would come back tomorrow. Many of them are gone at home."

"What do you want to buy back?"

"Wait a minute and edit the things I want to buy into a text message and send it to you. That's it, hang up brother!" Chen Qin in an instant! Just hung up the phone.

Chen Yang smiled speechlessly. A few minutes later, a text message was sent to his mobile phone. When he opened it, he saw that there were more than a dozen items that needed to be purchased.

On January 25, the weather was overcast.

At 7:30, he got up, washed up, and after finishing all this, Chen Yang went straight to the mall.

After staying in the mall for more than an hour, I finally bought the things I needed at home, and then drove to the house.

Chen Yang returned home around 10:30 in the morning, but when Chen Yang entered the house with his things, he always felt that the walls around his house were a little different.

So, the feet that stepped into the house stepped out of the door again and looked sideways:

"Damn it, when did the wall of my house collapse?"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like