The Engineering Boss

Chapter 106 Heading to Liangzi Township Construction Site

At about 8:30 in the morning on January 9, Mr. Yang of the Liangzi Township Project Department called Chen Yang and asked Chen Yang to go to the Liangzi Township Project Department to sign.

Mr. Yang told Chen Yang on the phone that due to the rapid progress of the pipeline drinking water project, the supervisor and the owner are very satisfied with it, so the speed of signing is also much faster. According to this speed, the project payment can be paid tomorrow at the fastest Dial it down, the slowest is probably on the twelfth.

Chen Yang originally wanted to go to the emergency project to see the acceptance of the above, but Mr. Yang's phone call completely interrupted his plan. After thinking about it, Chen Yang finally decided to take a trip to Liangzi Township.

On the way to Liangzi Township, Chen Yang received a call from Zhou Xinjin, telling Chen Yang that the foundation of the retaining wall had passed the inspection. If the foundation of the retaining wall could be poured overtime in the afternoon, the formwork would be ready the next day.

After the steel formwork is supported, it is necessary to notify the above person to check and accept it. This is a necessary procedure. However, Zhou Xinjin told Chen Yang that he didn't plan to let the people above come to see the acceptance of the formwork. He would communicate with the above and take a few photos and send them to them, which would not affect the concrete pouring time here.

After Chen Yang hung up the phone, he immediately called the person in charge of the commercial mixing station and told him to send him 150 cubic meters of concrete to the construction site at 2 p.m., and then immediately called the junior administrator of the emergency project I made some arrangements on the phone, and told him the phone number of the person in charge of the commercial mixing station by the way, so that he could communicate with the person in charge of the commercial mixing station to coordinate concrete matters in the future.

It was already 10:30 in the morning when Chen Yang arrived in Liangzi Township. He went to his office first, but found that there was no one in the office, so he drove towards the construction site.

As for Mr. Yang, Chen Yang chose to go for a walk in the afternoon. He hadn't been to the construction site for a while, so Chen Yang decided to check the situation on the construction site first.

Half an hour later, Chen Yang drove to the middle of the mountain. Unfortunately, he saw seven or eight workers resting on the DN200 steel pipes by the side of the road. Chen Yang immediately stopped and walked down.

"Hey, isn't this Boss Chen? Boss Chen, you're here!"

"It's rare to see Boss Chen, you're finally here today!"

.........

More than half of these seven or eight workers knew Chen Yang. After all, many people were present when the wages were paid last time. They liked a boss like Chen Yang who kept his promise.

"Everyone has worked hard!" Chen Yang looked at everyone with a smile, "What number of steel pipes are you carrying now?"

The No. 1 main pipe has been welded, and the No. 1 branch pipe and No. 2 branch pipe are located here. Chen Yang can't tell which pipe the workers are carrying now.

One of the workers said with a smile: "We don't know what number of branch pipes we are lifting, but your administrator said that we are lifting the No. 2 branch pipe, and it seems that the No. 1 branch pipe has basically been lifted, and now we are welding with all our strength. "

The day before yesterday, Chen Yang called the manager and construction worker of the pipeline respectively, and asked about the situation on the construction site. They told Chen Yang that the No. 1 branch line pipeline on the construction site has been welded for more than 900 meters, and the No. Domi.

If Chen Yang remembers correctly, the total length of the No. 1 branch line pipeline is 1,350 meters, and more than 900 yuan has been welded now. Only more than three hundred meters away.

As for the total length of the No. 2 branch pipeline, which is more than 800 meters, this is the shortest branch pipeline. Now more than 200 meters have been welded, and the rest should be welded within ten days.

"How many people are carrying the pipe today?" Chen Yang asked.

"Today we are the only ones who are lifting the pipe, and the rest are assigned to work on the previous big pipe. Some seem to arrange to bury the big pipe, and some seem to be doing some kind of pier, buttress. , anyway, we don't understand. I will do whatever your administrator asks us to do, and we don't dare to mess around.

"

Chen Yang laughed when he heard the words, turned around and took out a pack of cigarettes from the car and distributed them for them to smoke.

"Then you are busy, I will go to another place to have a look!"

"Okay! By the way, Boss Chen, when will you leave this time?" one of the village names asked.

"Why, what's the matter?"

"It's nothing, but my family kills the New Year pigs the day after tomorrow. I would like to invite you, Boss Chen, to our house to have a meal with the pigs." The villager sincerely invited.

Chen Yang thought for a while and said, "If I don't have anything to do there, maybe I'll be on the construction site for a day or two, then I'll come to your house to eat pig-killing rice when I have time."

"Okay, if you want it, then I will ask you tomorrow if you have time, hahaha!"

Chen Yang continued to drive into the mountains. After about 20 minutes, Chen Yang finally came to the farthest and highest construction site - the water intake point.

As soon as Chen Yang got off the car, the junior construction worker came in front of Chen Yang.

"You guys are so busy! Can you finish the demolition in five days?" Chen Yang looked at the junior construction worker next to him and asked.

At this time, six workers were dismantling the formwork, which seemed to be the concrete that was just hit yesterday. Two of them were their own junior workers, and the other four seemed to be villagers invited by the local area.

At present, the water intake weir has been completely built, and there is a gap on one side to drain the water in the ditch, but on the side where Chen Yang is standing, only the grit chamber has not been built yet.

"Boss, five days should be no problem. Because the water intake corridor was not chiseled, it took two days for the inspection to fail. Otherwise, the construction is basically completed now." The junior construction worker said with some self-blame.

Chen Yang said with a smile: "It's okay, and it didn't take much time. Do you know how other places are doing?"

This water intake point is a hidden task in the system task, and the stipulated completion time is before January 18th. Today is only January 9th, and there are still 9 days before the task time stipulated by the system.

If it can be completed in five days, it will not exceed the time of the system task.

"I know some. Now a group of workers are arranged to lay the main pipeline, make buttresses and townships. It seems that it will be completed in ten days. Two excavators are arranged for the No. 1 branch pipeline and the No. 2 pipeline respectively. Excavation of pipeline ditches for the branch pipeline. At present, the No. 1 branch pipeline has been excavated more than 1,200 meters, and the No. 1 branch pipeline will be completely excavated the day after tomorrow at the most; and the No. 2 branch pipeline has been excavated for more than 500 meters The excavation will be completed within four days."

"A group of workers are lifting the pipes of the No. 1 branch pipeline and the No. 2 branch pipeline. I don't know how much they have lifted. Our people recorded it on the spot. We need to ask him to know."

From what the junior administrator said, Chen Yang basically understood the situation at the scene, which was a little bit better than what he understood two days ago.

"Hurry up here at the water fetching point, and try to finish it in five days. It's almost time for lunch, come back to eat with me!"

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like