Monster Factory

Chapter 842: : During construction

The lively vicinity of Friedrichstrasse is very lively.

In front of the giant beast industry's fleet, it is an open space separated by a white construction wall. Now the urban health workers in Berlin are dismantling this part of the wall.

The original old building has been demolished, leaving some gravel and reinforced concrete pile foundation buried in the ground. According to the normal procedure, if you want to build a new building on this land, you must first clean up the original concrete pile foundation structure and then re-enter the pile foundation or concrete frame according to the construction drawings of the new building.

This step is the fastest, and it takes seven days at the earliest.

Now the street is crowded with pedestrians, on the opposite Friedrichstrasse, this street-facing coffee shop, or a place where guests can be laid-back, all surrounded by curious citizens.

They greeted each other with their familiar friends while ridiculing the next possible performance of the behemoth industry.

Even these media reporters also lost the interview car one by one, and ran to the second floor of the street opposite the third floor of the street, set up the photography equipment, leisurely coffee, while waiting for the performance of the giant beast industry.

"Hey guys, do you guys believe that this Chinese company can build a flagship store in one day?"

"Even stupid monkeys don't believe."

"Then you have set up so many interview equipment..."

“Meet the curiosity of those who can’t catch up with the excitement.”

The reporter comfortably tasted the coffee. Opposite the window, the giant beast industry team had already entered the construction site, but it seems that the employees of the giant beast industry don’t seem to be in a hurry.

They ordered hundreds of cups of steaming take-away coffee from the opposite coffee shops. The workers in orange-colored uniforms each took a cup of coffee and then finished laughing and laughing before they got off the bus. A pile of plastic anti-collision boxes was removed from the baggage floor.

Most of the equipment and equipment contained in the plastic boxes are not known, but according to the operation of these employees, these instruments should be all kinds of detection and detection.

They used instruments to measure back and forth on the land belonging to the behemoth industry. There were several technical personnel on the side of the truck. They sat in front of the folding table filled with laptops and occasionally issued orders to the inspectors through the intercom.

Time passed by little by little.

The people who watched the side watched from the initial joke mentality, and now it feels boring and boring, it is better to go back to work. The time has passed two hours.

During these two hours, the Chinese people on the opposite site have been testing.

With the instrument, every inch of the thousands of square meters of land was tested, and even with the help of a small rotary drilling machine, several elongated metal probes were used to detect the depths of the underground. They don't understand why this is, isn't it building a three-tier flagship store?

It is not building a skyscraper, or a subway.

If there are journalists or people who are able to access the data terminals of these detectors, they will find that on the computer screen of the folding table, there is already a detailed three-dimensional model, each pile under the land, each The root pipe, each piece of gravel is clearly marked.

This very advanced and rapid means of geological exploration is very boring to the people who do not understand the situation.

So two hours later, the crowds in the vicinity were scattered by two-thirds, and there were still many people in the coffee shop opposite the street.

They didn't wait, a cup of coffee didn't work hard, they expected the big scene finally appeared.

The field staff opened the first Mercedes heavy truck container and placed a tilted track on the container. Then, in the eyes of many people standing up and looking forward to it, a wheeled, some construction machinery like the giant i-type roared from the container.

At the first sight of this mechanical car, many onlookers raised their mobile phones and kept taking pictures of it.

It is not a giant i-type, and the giant i-type is also present in a small number in Europe. At the same time, in Germany, which is called the mechanical kingdom, the construction machinery of the giant **** i-type double-mechanical arm structure will not cause the people to pay too much attention.

It is a giant **** 2 type designed by the Beast Industry for the construction of energy service centers.

The Energy Service Center is now in its fourth phase of construction, with more than 2,000 energy service centers across the country. In order to be able to build this unified standard building more quickly across the country, the monsters are too large for the giant **** i-type volume, not suitable for indoor construction.

The size of the giant i-type is reduced, from the fuel-generator hybrid to pure electric, and two additional robot arms are added.

This is a crab-like, high-tech machine with four robotic arms...

The traditional giant i is equipped with a diesel generator set with a weight of nearly two tons, a huge fuel tank, and a rear removable tool table. Now these components do not exist on the Titan 2 type. It is mainly used for indoor construction and is powered by a cable.

An additional two robotic arms are added to the rear workbench, which is technically more difficult than making a giant i-type.

Of course, its operation difficulty is greatly increased, requiring two operators to operate remotely together. The operators responsible for building the energy service center have been practicing for half a month before they can work together to get into the construction.

Unlike an excavator, people who drive can go up and learn basic operations in less than half an hour. The rest is the slow exercise that makes perfect.

At the same time, this kind of machinery specially designed for the giant beast industrial construction department and integrated intelligent construction procedures does not have the premise of selling well in the construction market. When building an energy service center, the Giant God 2 was mostly built indoors, so few people have seen it outside, not to mention Europe.

No matter who it is, the first sight of this guy must be turned over by its strange appearance.

In particular, the two operators who have already reached the level of familiarity can easily operate the giant **** 2 down to the construction site, and spread the four mechanical arms that are more flexible than the crab claws. When they are in the air, they feel the boring masses. They are more excited.

They all want to put the mobile phone on the glass one by one, and the photo is not enough to turn into video.

The Crab-like Giant 2 is used to clean the site, and its four robotic arms are equipped with four different tools. There are broken hammers, hydraulic shears, flat shovel heads, and hammers that can reciprocate. Connected to the power supply, its four robotic arms, waving back and forth on the site filled with dirt and concrete fragments.

For a time, the dust on the thousands of square meters of construction site was soaring and thundering.

Outside the construction site, two urban sanitation vehicles are parked here. When the staff opened the water mist gun machine to suppress the dust, it also licked the mouth like a fog gun machine outlet.

The charm of complex machinery is often greater than the appeal of stars.

When I was a child, I saw the excavator loaded with a hammer for the first time. When I was demolishing the building, I could stand by and watch the morning. When someone first saw a variety of peculiar large-scale machinery in the mining area, they could relish the entire mining area with great interest.

Now these Germans are watching this kind of mentality, and the boring people are getting more and more.

Some of them drink coffee, some are straight in the cold wind, but their eyes are always on the construction site, and they are constantly wielding the giant arm 2 of the robotic arm.

It seems that ten excavators are in front of it, and it is more efficient than it.

Its robotic arm swing speed is as flexible as the construction workers, and in less than an hour, thousands of square meters of worksite has become a flat and tidy open space.

Those muds have been hit by pneumatic impact hammers with an instantaneous impact of ten tons, and the hammers are like bricks.

The concrete pile foundation exposed to the ground was also trimmed by the giant **** type 2, and now it is a horizontal plane with the hard land.

It is now at 3 pm local time in Europe, and the time to market for the second generation of the giant animal industry, and one day and sixteen hours.

Now, the opposite floor of Friedrichstrasse is crowded with people, and I don’t know how many shots are aimed at the land.

The giant beast industry flattened the open space in an incredible hour. The old piles that were repaired were not removed, but their presence provided a solid support platform for the newly built flagship store.

The people think so, but the giant beast industry has not done so.

It was also a mechanical device that was opened by the staff from the container.

This is a machine that looks like a water tanker, but it is much smaller, only the body supports the tank, and there is no cab.

The staff from China did not rush to adjust this equipment, and then the crab-like giant 2 also ran to join in the fun, it fixed a hose on the equipment, and then half-lifted in the air.

When the automatic valve is opened, a milky white, somewhat creamy semi-solid liquid is sprayed from the hose and free to fall onto the leveled ground.

Remember the mobile version of the URL:

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like