Monster Factory

Chapter 361


You can search for “Super Monster Factory” in Baidu to find the latest chapter!

Looking back, Ye Qing is still talking about what happened before, and completely ignored the string of streamlined and wonderful algorithm commands she just entered.

“Hu ~” Yun Shi relaxed, but fortunately encountered a computer noob.

Once the self-test starts, the hard drive cannot be stopped because doing so will completely damage the hard drive.

Yun Shi, somewhat guilty, quickly connected to another storage array.

After a few minutes, Ye Qing finished the story just now.

Hearing this, Yun Shi stared wide-eyed, this group of foreigners is obviously looking for something intentionally. Whether metal will affect the operation of electronic devices, this can only be known after passing professional instrument testing.

Without any detection, this group of foreigners do things by feelings.

It is like they do to engage in programming, they Boss do not allow them to roll out of trouble.

I really want to help with something, but when I think of my current predicament, Yun Shi feels discouraged.

“The storage array has not been transferred, don’t let me wait too long.” On the Kaswal side, the accompanying Engineers have connected the computer to the Server Cluster. All the rough work has been done by the Chinese people. They just need to move on the keyboard. With a finger, you can easily earn a lot of dollars.

“What’s the hurry, are you checking the hard disk data?” Yun Shi returned a pretty white eye. She didn’t get used to this group of nostrils toward Heaven and Earth foreigners.

“What do you guys do?” Kaswal is angry. It takes 2 to 3 hours for hard disk detection. This is obviously the last step. Now that they are testing the hard disk in advance, isn’t it delaying their time?

The computer next to it is Ji Ke’s. Ji Ke thinks it may be that Ye Qing is letting Yun Shi detect the hard drive.

There is special software for hard disk detection. The simplest point is to start it and it will be automatically detected. His Boss is standing next to him, and of course he unconditionally supports the Boss decision.

“It’s okay to let them test themselves.” An Engineer suggested to Kaswal: “We can save a step instead. In the future, if there is a problem with the storage array, we can also blame them.”

Kaswal laughed hē hē nodded, since the hard disk test cannot be stopped, then they also come to test and test, so that this group of Chinese people know what is professional.

Compared with storage arrays, Server hardware detection is much more complicated.

The most important part is to detect the temperature of the server when it is saturated.

The electronic device will emit a lot of heat, and overheating will cause accelerated hardware aging, and will seriously affect the smoothness of the system’s operation and even crash.

Therefore, the heat dissipation design of the large-scale computer room is very important.

Different Servers need to be equipped with different heat dissipation systems, and in terms of distribution, those large-scale network companies can be described as racking their brains.

Take Google, which owns the world’s largest server cluster. The dozens of server clusters they set up around the world are all located near the big river and the sea, or the cold weather makes the penguins do not want to stay longer.

Close to the sea and lake, cold water can be drawn directly from the deep water to cool down in the machine room, and then the hot water is discharged into the cooling pool to cool down, and then discharged into the water source again.

It would be even better if the Server is built in World of Ice and Snow, a set of air exchange system, circulating water cooling system. The temperature below freezing point can take away a lot of heat generated by Server.

by all means whatever happens must not underestimate the heat emitted by the server.

If the heat generated by a processor is not cooled by a fan, it can break through 90 degrees within a few minutes. Either the computer automatically powers off to protect the processor, or the processor burns out.

Not to mention the notebook, when running in the summer, I am afraid to play on the lap without any one.

The greater the power, the greater the heat generated. Not only the processor, the motherboard also emits heat. A Server unit is equipped with 8 high-power processors. It is conceivable how much heat will be produced by the Server Cluster, which occupies an area of ​​more than 1000 square meters in front of you.

Not all Servers can enjoy the convenience brought by this nature.

If you want the server to run normally, you must control the temperature of the computer room between 20 and 30 degrees, and keep the server hardware temperature below 40 degrees.

But the vast majority of Server Clusters worldwide are all set up in cities, so how to design a reasonable heat dissipation plan has become the most concerned issue of all companies.

Monster Heavy Industry’s Server cooling solution is designed by himself. Kaswal and his team have long observed this cooling system.

Useless!

This is the evaluation they gave after observation.

The further away the basement is from the ground, the more obvious the feeling of warm winter and cool summer. Obviously, you can’t save money even in the Server room, even if the dedicated precision air conditioner is not installed?

Kaswal looked up again at the concrete dome, only the cooling and exhaust ducts distinguished by different colors.

These pipes are connected to the metal frame that houses the cabinet, apart from this, and there is no longer any cooling measures.

Companies that dare to do so either know nothing about the requirements of the server room, or the server room is set up in the Arctic.

Defects mean business opportunities.

Kaswal very pleased in one’s mind thinks that after a while, he will make the server soar to more than 60 degrees. This group of people had to be obediently, and even begged themselves to re-provide a sky-high cooling system.

They are professional Server architecture companies, from programming to hardware to supporting facilities.

If you do the cooling system, you can get a reward of $500 even if you say less.

“Is the cooling system ready?” Kaswal gave the team a look: “Since you have tested the hard drive, then we will first conduct a temperature test of the server in order not to waste time.”

“For your sincerity, I decided to use intelligent computing solutions for you to test for free.”

“This software can retrieve the hardware power consumption information from our hardware information database according to all the hardware models of the Server, and then combine the processor temperature to perform simulation calculations to obtain the total heat output of the computer room.”

“If you fill the server with an electronic thermometer, you will find that our data is no more than one degree different from the real temperature.”

“All right!”

The answer was Yun Shi.

Looking at the doubtful eyes thrown by others, Yun Shi brace oneself added: “I mean the hard disk on my side has been tested.”

“What?” Kaswal’s dumbfounded expression on the side was less than ten minutes past: “The hard drive self-test will take at least an hour and a half. Will you detect it?”

“The number of the hard disk in question is written on the screen, and I feel uneasy. You will re-check one side later.” Yun Shi turned his head grunted, and his long silver-gray hair gliding out of the air in a beautiful track.

“I am also an intelligent algorithm.”

Of course, this sentence was said by Yun Shi in his heart.

“Luo Li is wordy for a long time, you are the beginning.” Master Craftsman disdain: “Our cooling system is also intelligent. When the Server is running, the temperature will automatically intervene if it exceeds 20 degrees. You can try it.”


Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like